Project Description
Petrochemical
Altamira chemical terminal expansion
Client: Vopak México SA DE CV
Year: 2019-2020
Location: Estado de Tamaulipas. Manzanillo. México
Detailed engineering for 16 tanks.
Rehabilitation of the Ammonia IV Plant,
Client: Pemex
Year: 2018
Location: Veracrúz, México
Engineering for the rehabilitation of the Pemex Fertilizers IV ammonia plant.
Recovery of service factor in polyethylene plants
Client: Ecopetrol S.A.
Year: 2009
Location: Barrancabermeja, Colombia
EPC- recovery of the service factor of polyethylene plants I and II to increase the capacity of the polyethylene plant II up to 12,000 LBH of the management of the Barrancabermeja Complex
Methanol Plant Extension
Client: Metor
Year: 2006
Location: Jose, Venezuela
EPC Lump Sum, Turnkey. Second production line for a 850,000 MT Methanol Plant.
Methanol Plant, Venezuela
Client: Metor
Year: 1991
Location: Jose, Venezuela
EPC Lump Sum, Turnkey
Construction works for a 726,000 MT per annum capacity methanol production plant. By the 90’s, this was one of the largest plants in terms of size and production worldwide.
Infrastructure & Industry
Infrastructure & Industry